Formwork Lateral Pressure
Calculate maximum lateral pressure on vertical formwork from fresh concrete, per ACI 347R or CIRIA C700.
BEng Mechanical Engineering (Hons), CMIOSH, LEEA Member
Mechanical engineer and certified lifting equipment examiner with 18 years in heavy industry, structural steelwork, and crane operations across construction and resources sectors.
1 April 2025
Professional verification required
These calculations are provided for estimation and educational purposes only. Results must be verified by a suitably qualified and licensed engineer before use in any design, specification, or construction context. Numly accepts no liability for decisions made on the basis of these results.
Related calculators
Concrete Volume & Cost
Calculate concrete volume and materials cost for slabs, footings, columns, and beams.
Concrete Mix Design (Nominal)
Estimate constituent quantities for a nominal concrete mix by mass and volume per mยณ.
Reinforcement Quantity
Estimate reinforcing bar quantity (kg) for slabs, beams, and columns from reinforcement ratio.